Development Finance Calculator

Development Finance Calculator: How The Numbers Actually Work

If you are putting a development deal together, you need to know what it actually costs before you commit to a site, not after you have exchanged. That is what our development finance calculator is for. Put your numbers in, land cost, build cost, GDV, and you get a realistic picture of how much you can borrow, how the drawdowns work, and what the finance will cost you from day one to exit.

I'm Tim from Build Capital. I have spent over 20 years in this industry, including time as a first line underwriter on the lender side, so I know how these deals get assessed from the other side of the desk. This page explains how the numbers behind a development loan actually work.

☎ 07930 653 209 Get a Quote → I'll come back with real numbers, usually the same day.

Run Your Numbers

How Development Finance Interest Is Calculated

Interest on a development loan is calculated on the amount drawn, not the full facility. If you have a £1 million facility but have only drawn £400,000 so far, you are paying interest on £400,000, not the full million. Most lenders quote a monthly rate, applied to the outstanding balance as it grows with each drawdown.

Because the loan is drawn in stages rather than released in one lump sum, your total interest cost builds gradually across the build programme rather than from day one on the full loan amount.

Interest Drawn in Stages vs Rolled Up

On almost every development deal, interest is rolled up rather than serviced monthly out of your own pocket. It is added to the loan balance and paid off in full when the development is sold or refinanced.

During construction you have no income coming in from the site, so rolled up interest keeps your cash free for the build itself. Drawdowns then happen in stages, tied to work completed on site and certified by a monitoring surveyor.

How Much Can I Borrow for a Development?

Lenders size a facility using two caps and lend against whichever gives the lower figure.

Loan to GDV

The loan measured against the Gross Development Value, the value of the finished scheme. Typically in the region of 60 to 70 percent.

Loan to Cost

The loan measured against total project cost, land plus build plus fees. Typically in the region of 80 to 90 percent.

A scheme with strong sale values but thin build costs might max out on loan to GDV. A scheme with expensive construction relative to its end value might be capped by loan to cost instead.

The point

The calculator runs both side by side, so you know which one is actually limiting your borrowing before you go to a lender.

How the Money Gets Released

Day One Land Advance

Released on day one to help you buy the site. Usually the smaller piece of the facility, and how much you get depends on whether you already own the site, whether planning is in place and how the rest of the costs stack up.

Build Cost Funding in Tranches

Released as construction progresses, each tranche tied to work completed on site. Plan your cash flow for the gap between spending on site and the next drawdown landing.

Monitoring Surveyor Fees

An independent surveyor checks progress and signs off each drawdown. You pay for this, so budget for it properly, because every tranche depends on it.

Arrangement Fees, Exit Fees and Contingency

Arrangement fee: charged at the start of the facility.

Exit fee: charged when the loan is repaid, usually on sale or refinance of the completed scheme.

Monitoring surveyor: charged across the build, as above.

Contingency: a reserve in your costs for unexpected spend on groundworks, materials or anything else that pushes the build over budget. How much a lender wants depends on the build type and your track record.

From the underwriting side

Fees vary by lender, so build them into your costings rather than treating them as a rounding error. A scheme with no sensible contingency will raise questions at underwriting.

Profit on Cost and Profit on GDV

Lenders check your margin two ways: profit on cost (expected profit against total project cost) and profit on GDV (expected profit against finished value). A scheme can look fine on one and weak on the other, and lenders want enough margin that cost overruns or a softer sales market will not wipe out your return, or theirs.

Residual Land Value

Residual land value is what is left for the land once you take the GDV and subtract build costs, fees, finance costs and your required profit. It works backwards from the finished value to tell you what you can actually afford to pay for the site.

If the land costs more than the residual value supports, the deal does not stack, no matter how good the finished product looks on paper.

Current Development Finance Rates UK

The development finance market has cooled after a strong run. Q4 2025 was a high point, with £420.3 million of development loans written during the quarter, up from £376.8 million in Q3. Q1 2026 then saw development lending reach £276.5 million, down 34%, with average loan to value falling from 58.64% to 56.64% as lenders took a cautious approach to risk.

Volumes slipped again to £273.5m in Q2 2026, total lender loan books fell 10.6% to £10.3bn by the end of June, and average loan to values rose to 57.66%.

The point

With this much movement quarter to quarter, run your own numbers now rather than relying on a figure you saw months ago.

Topping Up the Senior Loan

Mezzanine Finance

Sits behind the senior loan and increases your overall leverage, so you put less of your own cash in. Adds another layer of cost on top of the senior debt.

Stretched Senior

One facility at higher leverage instead of two lenders. Simpler to manage, priced to reflect the extra risk.

Equity and JV Funding

A partner puts in cash for a share of the profit rather than charging interest. Works if you have the deal but not the capital, but you share the upside.

Development Exit Finance

Once a scheme is built but not yet sold, development exit finance replaces the development loan with a cheaper facility while you market the units. It stops rolled up interest eating your margin and buys time to achieve full sale value rather than being forced into a rushed sale.

Useful if your build finishes ahead of your sales pipeline, or if the market has slowed and you need breathing room. More on development exit finance →

How the Maths Changes by Project Type

Ground Up New Build

From a cleared site to finished units. With no existing structure to fall back on, lenders look closely at build costs, your contractor and your experience.

Heavy Refurbishment and Conversions

Structural works, extensions or change of use. Funded like ground up, with staged drawdowns, but the lender will want to understand the existing structure.

Permitted Development and Office to Residential

Can avoid full planning, which speeds things up and cuts planning risk. Lenders will check the PD route genuinely applies to your building and use class.

Barn Conversion Finance

Often listed or agricultural buildings in rural spots with site specific planning conditions. Same fundamentals, but valuation and planning need more care.

Self Build Finance

For building your own home rather than to sell. Still staged drawdowns against certified work on site.

Land with Planning

Consented land is worth more because planning gain removes risk. Sites bought to secure planning first are priced and structured differently.

Finance for First Time Developers

Lenders will fund first time developers, but they look harder at the team around you, your contractor, your professional advisers and the strength of the scheme itself, to offset the lack of a track record. A well structured first scheme with a solid contractor and realistic numbers can still get funded. It just needs more groundwork going into the application.

Development Finance for SPV Limited Companies

Most development finance is lent to a Special Purpose Vehicle, a limited company set up for that one project. It keeps each scheme ring fenced and gives the lender a clean security position. If you have not set one up before, get it right early, because lenders will want to see it in place as part of the application.

Why Work with Build Capital?

I was an underwriter before I was a broker. I know what makes an application strong and what gets it declined or priced up before it even gets that far.

I'm independent of every lender. I'm not pushing you toward a product because it suits someone else's targets.

I search across 100+ lenders on real data. Rates, fees and appetite shift constantly and no generic rate card keeps pace. My platform shows what's actually available right now.

Want the Real Numbers?

Run your figures through the calculator, then tell me about the scheme and I'll check it against real lender terms across the market.